10 questions · under 3 minutes · always a range, never a single figure
Four ways to have solar
Rooftop is right for most homes.
A typical 4–4.5 kWp system costs about £6,400–£7,600 installed (DESNZ median, Energy Saving Trust). Since 27 August 2026 there is also a legal plug-in route for homes without a roof to call their own.
Installed cost, before VAT relief
£ hundreds££ £5,000–10,000£££ more with a battery
Relative installed cost, not a quote.
Right for most homes£££
Rooftop solar
Works on south, east-west and even north-facing roofs, with lower output facing north. East and west faces make about 80% per panel of a south face.
Money 0% VAT until 31 March 2027 · export paid at 3–6p (basic) to about 12p as an import customer
Legal in Great Britain since 27 August 2026: solar only, up to 800 W, plugs into a socket. Kits with a battery still need an electrician to hardwire them.
Money No grant or export payment · retail kits carry 20% VAT
What would solar pay back on your roof? Move the dials.
We start from a typical home — twelve panels on a south-facing roof, 2,700 kWh a year, someone in some days. Change what you know and watch the payback move. The full calculator asks ten questions and gives you your own range.
Your home · quick picks
Main roof faces
Someone usually home
Tariff
UK average yield, 950 kWh per kWp, until you add a postcode · typical pitch, no shading assumed.
Payback dials · estimate
Estimated payback9–14 years
Yearly benefit£650–£790 a year£7,200–£9,000 installed
4,400–5,400 kWh a year from 12 panels (5.2 kWp), covering about 34% of 2,700 kWh.
Estimates, always a range. Costs are DESNZ medians for MCS installations (2025/26) and Energy Saving Trust figures, checked 24 September 2026; batteries are extra. Every number and its source is in the results page’s “How this estimate works”.
Want it for your roof? The calculator keeps these picks and asks the rest — tenure, pitch, shading, what you have or plan.
What decides your payback
Five things move the number more than the panels do.
The Energy Saving Trust's 9–12 years assumes an average roof and an export payment. Your roof, your daytime use and your tariff decide where in that range you land — or outside it.
Roof damage comes from bodged fixings, not from panels. Three things you can see from the ground.
Cracked or badly refitted tiles around the array
Hooks go into the rafters under lifted tiles, then the tiles go back flat. Lifted or broken edges mean water gets in.
No bird protection
Pigeons nest under panels. Mesh fitted at install, outside the nesting season, is far cheaper than fitting it later.
Loose or unclipped cables
Cables should be clipped clear of the roof, not draped over tiles or hanging under the array where they chafe.
Never go on the roof or open an isolator. BRE found most solar fires started at DC isolators and connectors — look for cracked cases, rust or scorching without touching anything.
Support differs by nation and changes often. Every line below was checked on 24 September 2026; the full detail and sources are on the question pages.
0% VAT
On installed solar and batteries until 31 March 2027, then 5%.
Warm Homes: Local Grant
Free solar and, where it helps, a battery for owner-occupiers with EPC D–G and household income of £36,000 or less (or means-tested benefits). Runs to March 2028.
ECO4
Funded solar for eligible low-income homes with electric or heat pump heating — ends 31 December 2026.
Warm Homes Loan Scheme
Government-backed low-interest loans from September 2026; needs an MCS installer. Up to £15,000 for a battery.
Smart Export Guarantee
Suppliers must pay for export — 3–6p basic, about 12p as an import customer, 15–25p on supplier-install exclusives.
Eligibility, availability and rates change — check the official source before you commit to work. This page does not assess eligibility or submit an application.
Ten questions give you a generation range, the share of your electricity solar could cover, the money and the payback — with dials for panels, battery and tariffs. An MCS installer's site survey and performance estimate come next.