Do I need an MCS-certified installer?
Short answer
For export payments under the Smart Export Guarantee, yes: the system and installer need MCS or equivalent certification, and SEG applies in Great Britain only. MCS certificates are issued within 10 working days of commissioning. Plug-in kits and self-installs cannot get one. Many loan schemes also expect MCS.
Last checked 24 September 2026 · 2 sources
In more detail
- Ofgem SEG: solar up to 5 MW, GB only, MCS or equivalent.
- MIS 3002 6.3.2: registration on MCS Installation Database within 10 working days.
- Redeveloped MCS scheme: consumer code membership no longer mandatory; MCS financial protection instead.
The facts, dated
- 01MCS certificate generated no later than 10 working days after commissioning — 10 working days
standard · UK · checked 24 September 2026 · MCS
- 02SEG eligible solar PV capacity limit — 5 MW
scheme · GB · checked 24 September 2026 · Ofgem
Sources
- MCS — mcscertified.com/wp-content/uploads/2026/03/MIS-3002_Solar-PV-Systems-V6.0-Final…
- Ofgem — www.ofgem.gov.uk/environmental-and-social-schemes/smart-export-guarantee-seg
Last checked: 24 September 2026