What planning checks should an installer do before quoting rooftop or ground-mount solar?

Short answer

In England, permitted development usually covers roof panels projecting no more than 0.2 m and not above the ridge, flat-roof arrays up to 0.6 m high, and ground arrays up to 9 m² with height limits. Listed buildings, scheduled monuments, conservation-area highway frontages and Article 4 areas need checking. Scotland, Wales and Northern Ireland have different limits.

Last checked 24 September 2026 · 3 sources

In more detail

  • England SI 2023/1279 (21 Dec 2023): flat roofs allowed, prior approval on article 2(3) land.
  • England SI 2026/896 (27 Aug 2026): walls 0.2 m to a highway, 0.4 m otherwise; plug-in limits on timber.
  • Scotland SSI 2024/102 (24 May 2024): 1 m protrusion; CA principal/road-facing side excluded; not listed/WHS.
  • Wales: 200 mm, flat roof 1 m from edge and <=1 m high; stand-alone 4 m, 9 m2.
  • NI: 200 mm, not above ridge, not listed (unverified detail).
  • MIS 3002 cl.5.1.3: make customers aware of all permissions.

The facts, dated

  1. 01
    England pitched-roof projection limit — 0.2 m

    regulation · England · checked 24 September 2026 · legislation.gov.uk

  2. 02
    England flat-roof height limit above highest part of roof — 0.6 m

    regulation · England · checked 24 September 2026 · legislation.gov.uk

  3. 03
    England stand-alone solar panel area limit — 9 m2

    regulation · England · checked 24 September 2026 · legislation.gov.uk

  4. 04
    Scotland Class 6HA protrusion limit — 1 m

    regulation · Scotland · checked 24 September 2026 · legislation.gov.uk

  5. 05
    Wales roof/wall projection limit — 200 mm

    regulation · Wales · checked 24 September 2026 · Welsh Government