18x1FSolarEdge · HD-Wave single-phase inverter (SE2200H-SE6000H)

18x1F on a SolarEdge HD-Wave single-phase inverter: AC Voltage Too High: Grid voltage is above the country limit

Short answer

On a SolarEdge inverter, 18x1F means: AC Voltage Too High: Grid voltage is above the country limit. The inverter stops until the fault clears or is reset.

Reviewed 24 September 2026 · 1 source

What it means

The manual says: AC Voltage Too High: Grid voltage is above the country limit.

Part involved: AC grid protection (G98/G99 over-voltage).

Likely causes:

  • High local grid voltage (often worse at midday export).
  • Voltage rise on long/undersized AC cable.
  • Wrong country setting.

Is it safe?

Does the inverter stop?Yes
SeverityFault — clears by itself when the condition goes

The inverter stops until the fault clears or is reset.

Resetting itself: yes - reconnects automatically once grid voltage has been back inside limits for the reconnection time.

Manual reset: no.

What you can check

  • Read and note the exact code and time from the inverter display or app (screenshot).
  • Check the solar/battery AC isolator and the consumer-unit breaker/RCD are ON (do not reset a breaker that trips again immediately).
  • Note whether it happens on sunny middays (high export raises local voltage) - tell the installer/DNO.
  • Check if neighbours with solar have the same issue.
  • If the code persists, contact the installer. SolarEdge's list says 'OFF/ON to reconnect' for some codes - that means the inverter's own ON/OFF switch; only use it if your installer has shown you how. Never open the inverter or touch DC cables/connectors.

What the engineer will check

  • Measure grid voltage at the origin and at the inverter under export.
  • Check AC cable size / voltage rise between inverter and meter (IET PV CoP).
  • Confirm country/grid code set to UK G98 or G99 and protection settings unchanged.
  • Report persistent high supply voltage to the DNO (statutory limit 230 V +10%/-6%).

Who to ask for: PV installer / electrician; DNO for supply voltage.

Certification: Usually none (grid-side event). If persistent: installer/electrician to measure supply voltage and check settings; DNO investigates supply voltage (G98/G99 protection settings must not be changed without DNO agreement).

What you might notice

Sources

A code explains what the controller detected, not a confirmed root cause.

Reviewed: 24 September 2026