Solar · Error codes · SolarEdge
2x9SolarEdge · HD-Wave single-phase inverter (SE2200H-SE6000H)

2x9 on a SolarEdge HD-Wave single-phase inverter: AC Current Surge / Ground current surge: Ground current surge

Short answer

On a SolarEdge inverter, 2x9 means: AC Current Surge / Ground current surge: Ground current surge. The inverter stops until the fault clears or is reset. An engineer is needed to fix the cause.

Reviewed 24 September 2026 · 1 source

What it means

The manual says: AC Current Surge / Ground current surge: Ground current surge.

Part involved: Residual current / ground fault monitoring (RCMU).

Likely causes:

  • Large surge source or irregular load near the site.
  • AC connection problem.

Is it safe?

Switch the inverter off at its isolator if the code comes back.

Does the inverter stop?Yes
SeverityFault — clears by itself when the condition goes
Engineer needed?Yes

The inverter stops until the fault clears or is reset.

Resetting itself: may retry; persistent or repeated trips need investigation.

Manual reset: sometimes.

What you can check

  • Read and note the exact code and time from the inverter display or app (screenshot).
  • Check the solar/battery AC isolator and the consumer-unit breaker/RCD are ON (do not reset a breaker that trips again immediately).
  • Do not touch DC cabling or open the inverter; manufacturer says only a qualified technician should handle this.
  • If the code persists, contact the installer. SolarEdge's list says 'OFF/ON to reconnect' for some codes - that means the inverter's own ON/OFF switch; only use it if your installer has shown you how. Never open the inverter or touch DC cables/connectors.

What the engineer will check

  • Isolate AC and DC, wait for capacitors to discharge (5 min SolarEdge).
  • Reconnect strings one at a time to find the faulty string.
  • Insulation-resistance test.
  • Check AC neutral/earth connections.

Who to ask for: PV installer.

Certification: Electrician competent in grid-connected PV (BS 7671 Section 712; IET Code of Practice for Grid-connected Solar PV), ideally the original MCS-certified PV installer; brand-approved/trained installer to keep manufacturer warranty.

What you might notice

Sources

A code explains what the controller detected, not a confirmed root cause.

Reviewed: 24 September 2026