Short answer

Roof installations normally use scaffolding with edge protection, usually put up a day or two before and removed after. Typical house systems take one to two days on site, longer with batteries, backup wiring or roofing work. Ground mounts need trenching instead, and plug-in kits can be fitted in hours.

Last checked 24 September 2026 · 0 sources

In more detail

  • Secondary sources: Work at Height Regulations 2005 drive scaffold use; ladders not suitable for roof PV installs.
  • G99 approvals, structural checks or planning add weeks before install day.

What we saw in the field

[QA review 2026-09-24] P-13 AGREES. | Earlier notes: Field evidence: plug-in/battery unit hardwired in ~half a day - plausible.