Done properly, no. On tiles and slates, hooks are screwed into the rafters using an MCS 012 certified kit, tiles are trimmed or flashed so no new gaps appear, and hooks must not load or crack the tiles. Problems usually come from poor practice, so ask how fixings, flashing and broken tiles are handled.
Last checked 24 September 2026 · 1 source
In more detail
- MCS 012 7.7.2: hooks on frangible coverings must not load the covering, or pass a 1.0 kN/m2 (system) / 0.25 kN (hook) load test.
- MIS 3002 5.9.8: tiles/slates notched or flashed as appropriate.
- Sealant-only products not certifiable under MCS 012.
The facts, dated
- 01MCS 012 hook load test value for a mounting system on frangible coverings — 1.0 kN/m2
standard · UK · checked 24 September 2026 · MCS
- 02Sealant-only weathertightness products are excluded from MCS 012 certification
standard · UK · checked 24 September 2026 · MCS
What we saw in the field
[QA review 2026-09-24] I-12 AGREES. | Earlier notes: Agrees: installer claim that roof damage comes from bodged installs (lifted tiles, poor flashing, hooks not into structure) matches MCS 012/MIS 3002 requirements.