SolarpunkHomes
Sign inCall us · +44 7510 081687
Solar
Solar · Advice

Do I need a smart meter to be paid for exported solar?

Short answer

Yes, in practice. SEG payments need a meter that records half-hourly export with an export MPAN, which normally means a smart meter set up for export. Old spinning-disc meters can run backwards when you export, which should be reported. Households on Feed-in Tariff deemed export switch to metered export once a smart meter is fitted.

Last checked 24 September 2026 · 2 sources

In more detail

  • Ofgem SEG: meter capable of half-hourly export measurement, export MPAN, registered under the BSC.
  • Ofgem FIT: deemed export payments stop and metered export payments start when a smart meter records export.
  • Battery/EV additions must keep FiT generation measurable separately or payments stop.
  • Export not showing on bills usually means the export MPAN is not registered or the meter is not configured for export.

The facts, dated

  1. 01
    SEG requires a half-hourly-capable export meter with an export MPAN

    regulation · GB · checked 24 September 2026 · Ofgem

  2. 02
    FIT deemed export stops and metered export applies after smart meter installation

    scheme · GB · checked 24 September 2026 · Ofgem

Sources

Last checked: 24 September 2026