601 on a SMA Solar Technology AG Sunny Boy: The inverter has detected an excessively high proportion of direct current in the grid current

Short answer

On a SMA Solar Technology AG inverter, 601 means: The inverter has detected an excessively high proportion of direct current in the grid current. The inverter stops until the fault clears or is reset. An engineer is needed to fix the cause.

Reviewed 24 September 2026 · 1 source

What it means

The manual says: The inverter has detected an excessively high proportion of direct current in the grid current.

Part involved: grid frequency / anti-islanding / DC injection monitoring.

When it shows: The inverter has detected an excessively high proportion of direct current in the grid current.

Likely causes:

  • SMA corrective measures: Check the grid connection for direct current. If this message is displayed frequently, contact the grid operator and check whether the monitoring threshold on the inverter can be raised.

Is it safe?

Does the inverter stop?Yes
SeverityFault — clears by itself when the condition goes
Engineer needed?Yes

The inverter stops until the fault clears or is reset.

Resetting itself: yes.

Manual reset: Automatic when condition clears.

What you can check

  • Read the event number and message in the SMA Energy app / Sunny Portal (ennexOS) or the inverter's web interface and note the date/time for your installer. A red LED on the inverter means an event has occurred.
  • Check whether there is a power cut or grid work in your area.
  • If it happens once and the inverter resumes feeding in on its own, no action is needed; if the event keeps recurring, contact your installer.

What the engineer will check

  • Check grid frequency stability and AC wiring to the feed-in meter; for 601 check for DC on the grid connection; any change of monitoring thresholds only with DNO approval and SMA Service.

Who to ask for: PV installer / electrician; DNO liaison.

Certification: Installer liaison with the DNO; any change to grid-protection settings needs DNO agreement (G98/G99) and the manufacturer's installer/grid code.

What you might notice

Sources

A code explains what the controller detected, not a confirmed root cause.

Reviewed: 24 September 2026