4-4 on a myenergi eddi solar immersion diverter: Grid Sensor Error - grid CT incorrectly installed

Short answer

On a myenergi inverter, 4-4 means: Grid Sensor Error - grid CT incorrectly installed. The inverter stops until the fault clears or is reset. An engineer is needed to fix the cause.

Reviewed 24 September 2026 · 1 source

What it means

The manual says: Grid Sensor Error - grid CT incorrectly installed.

Likely causes:

  • CT on wrong cable or polarity wrong.

Is it safe?

Does the inverter stop?Yes
SeverityFault — needs a manual reset once the cause is fixed
Engineer needed?Yes

The inverter stops until the fault clears or is reset.

Resetting itself: after correction.

Manual reset: Reboot device from menu or via supply breaker.

What you can check

  • Read the fault on the eddi screen. Check the eddi supply breaker is ON. Report to installer.

What the engineer will check

  • Check grid CT on live grid cable and polarity.

Who to ask for: Electrician / plumber-electrician for immersion circuits.

Certification: Competent electrician (BS 7671); immersion heater work to Part P.

What you might notice

Sources

A code explains what the controller detected, not a confirmed root cause.