1112 on a Fronius International GmbH Fronius GEN24 / GEN24 Plus: Grid voltage exceeds the stored limit value so the inverter reduces power

Short answer

On a Fronius International GmbH inverter, 1112 means: Grid voltage exceeds the stored limit value so the inverter reduces power. The inverter keeps running with some functions stopped. An engineer is needed to fix the cause.

Reviewed 24 September 2026 · 1 source

What it means

The manual says: Grid voltage exceeds the stored limit value so the inverter reduces power.

Part involved: GEN24 inverter.

When it shows: Grid voltage exceeds the stored limit value so the inverter reduces power.

Likely causes:

  • Informational; if frequent, installer may raise with DNO.

Is it safe?

Does the inverter stop?Partly
SeverityWarning
Engineer needed?Yes

The inverter keeps running with some functions stopped.

Resetting itself: yes.

Manual reset: Automatic.

What you can check

  • Check Service Messages in Fronius Solar.web or the inverter's web interface (System > Event Log) and note the code.

What the engineer will check

Who to ask for: Fronius-trained installer.

Certification: Qualified electrician (BS 7671; MCS-certified PV installer for work on the PV array/DC side).

What you might notice

Sources

A code explains what the controller detected, not a confirmed root cause.

Reviewed: 24 September 2026